Public Jobs

Bidding Closed
8/26/21 2:00pm
Sandpoint Airport Runway 2/20 Pavement Maintenance Project
T-O Engineers
Sandpoint, Idaho
Keel Section Rehabilitation and Pavement Patching
Bidding Closed
8/12/21 10:00am
Post Falls Ponderosa Lift Station Replacement
T-O Engineers
Post Falls, Idaho
Request for Statement of Qualifications for Pre-Qualification of Bidders
Bidding Closed
8/5/21 2:30pm
Pocatello Airport SRE (MTE)
T-O Engineers
Idaho Falls Regional Airport, Idaho Falls, Idaho
Procurement of Multi-Tasking Equipment (MTE) for Airfield Snow Removal
Bidding Closed
7/28/21 2:00pm
Idaho Falls Regional Airport - ARFF
T-O Engineers
Idaho Falls Regional Airport, Idaho Falls, Idaho
Procurement of an Aircraft Rescue Fire Fighting (ARFF).
Bidding Closed
7/14/21 2:00pm
SUN - Runway, Taxiway and Apron Rehabilitation
T-O Engineers
Friedman Memorial Airport, Hailey, ID
Rehabilitate Runway 13-31, Taxiway B, and Aprons
Bidding Closed
7/13/21 2:00pm
Gulfstream Road and Utility Extension Project
T-O Engineers
Coeur d'Alene Airport, Coeur d'Alene, Idaho
Roadway and Utility Extension Project
Bidding Closed
6/30/21 10:00am
Tullamore Sports Complex Mass Grading
T-O Engineers
Post Falls, Idaho
This project includes mass grading of future sports complex site to establish subgrade, prepare building and parking lot pads, stockpile topsoil and erosion and sediment control.
Bidding Closed
6/16/21 11:00am
Pangborn Memorial Airport
T-O Engineers
East Wenatchee, Washington
Terminal Apron Reconstruction
Bidding Closed
6/22/21 2:00pm
Snake River Rest Area Sewer – Phase 2
T-O Engineers
Fruitland, Idaho
This project is generally described as a lift station, wet well, install of 675 ft of 3” HDPE pressure sewer under I-84, and install of 1,000 ft of 4” gravity sewer line with cleanouts and manholes to an existing caretaker’s residence.
Bidding Closed
6/16/21 2:00pm
Cascade Airport, Construct SRE Building
T-O Engineers
Cascade, Idaho
Snow removal equipment building consists of all elements necessary to construct a pre-engineered metal building for storage of the airport’s snow removal equipment.