Post Falls Bentley Lift Station Rehabilitation

Collection system improvements

Status

Bidding Closed

Prebid Date9/15/22 1:00pm

Bid Date9/29/22 10:00am

Company & Contacts

T-O Engineers

Meghann Kolb (mkolb@to-engineers.com)   (208) 762-3644

Location

Post Falls, Idaho

Work associated with the proposed project is generally described as follows:

Collection system improvements include rehabilitation of the existing wet well and valve vault, replacement of wet well cover and hatch, replacement of the pumps, new guide rails, new electrical/control, new generator, add flow meter, add emergency storage, and permanent by-pass pumping provisions. The project includes new submersible duplex pumping system capable of 275 gallons per minute, 1,260 gallons of emergency storage constructed of a buried precast concrete structure, bypass pumping provisions, new paved entrance driveway, regrading of an existing stormwater swale, minor landscaping and irrigation, and utility coordination.

The Post Falls Bentley Lift Station Rehabilitation project is open for bid to pre-qualified bidders only. Prequalified bidders include the list below:

• Strider Construction - (360) 384-8097 office
• S&L Construction - (208) 267-7996 office