COE - SRE PEMB Building - Redesign

Snow Removal Equipment Building

Status

Bidding Closed

Bid Date6/28/22 2:00pm

Company & Contacts

T-O Engineers

Corrie C Esvelt-Siegford (csiegford@to-engineers.com)   208-762-3644

Location

Coeur d'Alene Airport, Hayden, Idaho

Work associated with proposed improvements is generally described as follows:

Schedule A: Snow Removal Equipment (SRE) Building
Schedule B: Paving of Approaches and Asphalt Patch
Schedule C: Sewer Extension, Oil Water Separator, Concrete Floor, Floor Drain
Schedule D: Windows
Schedule E: Water Extension, Spigot, Fire Hydrant

Snow Removal Equipment Building consists of all elements necessary to construct a pre-engineered metal building for storage of the airport’s snow removal equipment. Work generally consists of the construction of a Snow Removal Equipment Building (approximate gross size 8,272 sft) with associated utility extensions, and vehicle access to taxiway and roadway. Work includes sitework to construct the new building to include: surveying, erosion control, excavation, embankment, subbase course, base course, asphalt paving, stormwater modifications and improvements, utility work, topsoil, seeding and other miscellaneous items. Building items include foundation and floor concrete, steel supply and erection, insulation, glass, overhead and man doors, HVAC, roofing, and electrical.