Snake River Rest Area Sewer – Phase 2

This project is generally described as a lift station, wet well, install of 675 ft of 3” HDPE pressure sewer under I-84, and install of 1,000 ft of 4” gravity sewer line with cleanouts and manholes to an existing caretaker’s residence.

Status

Bidding Closed

Prebid Date6/10/21 3:00pm

Bid Date6/22/21 2:00pm

Company & Contacts

T-O Engineers

Levi Howell (lhowell@to-engineers.com)   208-323-2288

Location

Fruitland, Idaho

This project is generally described as a lift station, wet well, install of 675 ft of 3” HDPE pressure sewer under I-84, and install of 1,000 ft of 4” gravity sewer line with cleanouts and manholes to an existing caretaker’s residence. The project includes but is not limited to horizontally directional drilling, pipe install, surface restoration, traffic control, and all other items shown in the project plans.