Cascade Airport Pavement Maintenance and Wind Cone Bid

Rehabilitate Runway and Install Wind Cone

Status

Bidding Closed

Bid Date3/29/21 2:00 pm

Company & Contacts

T-O Engineers

Sam Reagle   208-433-1900

Location

Cascade, Idaho

Work associated with proposed improvements is generally described as follows:

SCHEDULE A: Rehabilitate Runway 12-30 and Parallel Taxiway A
SCHEDULE B: Install Lighted Wind Cone and Segmented Circle

Schedule A will consist of the rehabilitation of Runway 12-30 and a portion of Parallel Taxiway
A. Work items include Runway Closure X placement, AOA Barricade placement, pavement
marking removal, crack repair, pavement cleaning, seal coat application, pavement marking
application, and site cleanup.

Schedule B will consist of the removal of an existing wind cone, and the installation of a new
lighted wind cone in a new location. Work items include demolition of existing structures,
construction of gravel pad and segmented circle, conduit and wire installation, installation of new
wind cone, and site cleanup.