Cascade Airport Pavement Maintenance and Wind Cone Bid
Status
Bidding Closed
Bid Date3/29/21 2:00 pm
Company & Contacts
T-O Engineers
Sam Reagle 208-433-1900
Location
Cascade, Idaho
Work associated with proposed improvements is generally described as follows:
SCHEDULE A: Rehabilitate Runway 12-30 and Parallel Taxiway A
SCHEDULE B: Install Lighted Wind Cone and Segmented Circle
Schedule A will consist of the rehabilitation of Runway 12-30 and a portion of Parallel Taxiway
A. Work items include Runway Closure X placement, AOA Barricade placement, pavement
marking removal, crack repair, pavement cleaning, seal coat application, pavement marking
application, and site cleanup.
Schedule B will consist of the removal of an existing wind cone, and the installation of a new
lighted wind cone in a new location. Work items include demolition of existing structures,
construction of gravel pad and segmented circle, conduit and wire installation, installation of new
wind cone, and site cleanup.