ESD Effluent Pressure Line Phase 4

The work involves the installation of approximately 1300 feet of a 24" HDPE pressure effluent pipeline within the City of Boise Property. The project also includes an air vac, connection to existing collection structure, meter vault, and a sample station building connected to the City of Boise SCADA system. The Eagle Sewer District reserves the right to extend the project to include additional pipe installation including a crossing of the South Fork of the Boise River

Status

Bidding Closed

Prebid Date8/27/20 3:00 pm

Bid Date9/9/20 3:00 pm

Company & Contacts

T-O Engineers

Levi Howell (lhowell@to-engineers.com)   208-323-2288

Location

Boise, Idaho