ESD Effluent Pressure Line Phase 4

The work involves the installation of approximately 1300 feet of a 24" HDPE pressure effluent pipeline within the City of Boise Property. The project also includes an air vac, connection to existing collection structure, meter vault, and a sample station building connected to the City of Boise SCADA system. The Eagle Sewer District reserves the right to extend the project to include additional pipe installation including a crossing of the South Fork of the Boise River
  Addenda (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
01-Addendum No 1 5.1 MB
02-Addendum No 2 1.1 MB