Rangely Airport Drainage Improvement Project

The project is 1 bid schedule. Bid Schedule 1 includes: replacing a culvert that runs under Connector A2, removing connector A3, and improve drainage on an existing swale that abuts the GA Apron.
  Addenda (click to expand/collapse)
Name Size
01-Addendum No 1 6.2 MB