Post Falls SH-41 Gravity Sewer Upsize

Schedule A – Gravity Sewer Main, upsizing and construction of approximately 2,700 LF of new 21-inch gravity sewer main along the east side of SH-41 from Horsehaven Ave. to 12th Ave. The new gravity sewer will be constructed to accommodate upstream and downstream connections for future projects. Additionally, 100 LF of 15-inch gravity sewer main will be installed along Horsehaven Ave.,and 30 LF of 8-inch sewer main will be installed at 16th Ave.
  Specs (click to expand/collapse)
This is available for download to registered users. Log in now
Order files below, price will be calculated by SQFT
Name Size
00-Division00_Bid and Contract Requirements 2.5 MB
01-Division01_General Requirements 1.3 MB
02-Division02_Existing Conditions 451.7 KB