Post Falls SH-41 Gravity Sewer Upsize

Schedule A – Gravity Sewer Main, upsizing and construction of approximately 2,700 LF of new 21-inch gravity sewer main along the east side of SH-41 from Horsehaven Ave. to 12th Ave. The new gravity sewer will be constructed to accommodate upstream and downstream connections for future projects. Additionally, 100 LF of 15-inch gravity sewer main will be installed along Horsehaven Ave.,and 30 LF of 8-inch sewer main will be installed at 16th Ave.
  Plans (click to expand/collapse)
This is available for download to registered users. Log in now
Order files below for $1.50 each
Name Size
01-01of13_Cover 1.7 MB
02-02of13_Notes 2.3 MB
03-03of13_Overview 1.6 MB
04-04of13_Sewer Plan and Profile 1.8 MB
05-05of13_Sewer Plan and Profile 1.9 MB
06-06of13_Sewer Plan and Profile 1.9 MB
07-07of13_Sewer Plan and Profile 1.8 MB
08-08of13_Sewer Plan and Profile 1.9 MB
09-09of13_Manhole Details 1.3 MB
10-10of13_Std Details 1.8 MB
11-11of13_Erosion Control 1.9 MB
12-12of13_Traffic Control 1.6 MB
13-13of13_Existing Signage and Fencing 1.5 MB