Vernal Groundwater Project

The Project consists of construction of approximately 2,500’ of 12” Perforated pipe system, manholes, and installation of a free draining granular gravel to serve as a cutoff structure to prevent groundwater inflows at the Vernal Regional Airport.

Status

Bidding Closed

Prebid Date3/5/20 10:30 am

Bid Date3/17/20 2:00 pm

Company & Contacts

T-O Engineers

Jeremy McAlister   435-503-5219 Ext. 501

Location

Vernal, Utah