IDA Terminal Renovations

The Base Bid, Improve Terminal, includes adding a new gate and boarding bridge to the second level of the terminal, expanding and relocating TSA screening area, and constructing a new second floor area and adding a new elevator. The Base Bid also includes expansion of the first-floor hold room under the existing second floor hold room, the addition of ground load walkways to the lower level gates, replacing the finishes in the first and second floor rest rooms, remodel of the second floor hold room and existing concession area, and remodel of the front lobby and restaurant lobby area. Add Alternate No. 2a includes the replacement of the existing south second level boarding bridge and Add Alternate No. 2b includes the replacement of the existing north second level boarding bridge.

Status

Accepting Bids

Prebid Date2/27/20 2:00 pm

Bid Date3/17/20 3:00 pm

Company & Contacts

T-O Engineers

Nathan Cuvala (ncuvala@to-engineers.com)   208-323-2288

Location

Idaho Falls, Idaho