Worland Taxilane C Widening Project

The project consists of construction of a 45’ x 457’ aircraft taxilane. The work involves 1,800 CY of unclassified excavation, 580 CY of subbase, 440 CY base course, and 540 tons of hot mix asphalt. The work also includes asphalt demolition and striping.
  Specs (click to expand/collapse)
Order files below, price will be calculated by SQFT
Name Size
00-Section00_Bid and Contract Requirements 1.9 MB
01-Section01_FAA General Provisions 482.4 KB
02-Section02_Special Provisions 235.3 KB
03-Section03_Construction Safety and Phasing Plan 418.5 KB
04-Section04_Construction Articles 1.6 MB
EXBI-SectionEXBI_Exhibit I - Geotechnical Engineering Report 1.3 MB