Midway Park Phase 1B

Project consists of retaining and protecting existing improvements, grubbing existing surface material in landscape and hauling off site, earthwork, utility extension, one (1) 67.5 foot by 80 foot shelter (steel shelter system), (1) 25 foot by 27.5 foot restroom, (4) electronic scoreboards, site electrical, concrete pavement, asphalt pathway, pressure irrigation sleeves, and amended import topsoil.
  Specs (click to expand/collapse)
Order files below, price will be calculated by SQFT
Name Size
00-Division00_Bid and Contract Requirements 2.3 MB
01-Division01_General Requirements 652.1 KB
03-Division03_Concrete 133.3 KB
04-Division04_Masonry 98.5 KB
05-Division05_Metals 89.1 KB
07-Divsion07_Thermal and Moisture Protection 140.9 KB
08-Division08_Openings 145.3 KB
09-Division09_Finishes 91.5 KB
10-Division10_Specialties 100.1 KB
32-Division32_Exterior Improvements 152.7 KB
GT-DivisionGT_Geotechnical Evaluation 1.5 MB