Midway Park Phase 1B

Project consists of retaining and protecting existing improvements, grubbing existing surface material in landscape and hauling off site, earthwork, utility extension, one (1) 67.5 foot by 80 foot shelter (steel shelter system), (1) 25 foot by 27.5 foot restroom, (4) electronic scoreboards, site electrical, concrete pavement, asphalt pathway, pressure irrigation sleeves, and amended import topsoil.
  Addenda (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
01-Addendum No 1 1.3 MB
02-Addendum No 2 4.9 MB