Greybull Water Line Project

Water Line Project

Status

Bidding Closed

Prebid Date9/18/19 1:00 pm

Bid Date9/24/19 1:00 pm

Company & Contacts

T-O Engineers

Josh Morris (jmorris@to-engineers.com)   (307)587-3411

Location

Greybull, Wyoming

The project includes: installation of approximately 1,000 feet of 8-inch and 8,500 feet of 6-inch AWWA
C-900 water line; installation of a concrete vault, water services, gate valves, and fire hydrant stub-outs.

A pre-bid conference will be held at 1:00 PM local time on September 18th, 2019 at the Greybull Town
Hall 24 South 5th Street Greybull, WY. A site tour will follow the pre-bid meeting.
Attendance at the pre-bid conference is mandatory.