City of Post Falls SH-41 Gravity Sewer Upsize

12th Ave to Horsehaven Ave

Status

Accepting Bids

Prebid Date9/4/19 10:30 am

Bid Date9/18/19 10:00 am

Company & Contacts

T-O Engineers

Zach Thompson (zthompson@to-engineers.com)   208-762-3644

Location

Post Falls, Idaho

Work associated with the proposed project is generally described as follows:

Schedule A – Gravity Sewer Main, upsizing and construction of approximately 3,040 LF of new 21-inch gravity sewer main along the east side of SH-41 from Horsehaven Ave. to 12th Ave. The new gravity sewer will be constructed to accommodate upstream and downstream connections for future projects. Additionally, 115 LF of 15-inch gravity sewer main will be installed along Horsehaven Ave., and 30 LF of 8-inch sewer main will be installed at 16th Ave.

Schedule B – 12” Gravity Sewer Main, 12th Ave., installation of approximately 300 LF of new 12-inch gravity sewer main along the south side of 12th Ave.