Dixon Airport Runway Repair

Airport Runway Repair Project

Status

Accepting Bids

Prebid Date8/14/19 1:00 pm

Bid Date8/28/19 2:00 pm

Company & Contacts

T-O Engineers

Wes Werbelow (wwerbelow@to-engineers.com)   (307)587-3411

Location

Dixon, Wyoming

Removal of asphalt, base, and subgrade and replacement of subbase, base, and asphalt on two patches on
the runway. Striping of threshold and aiming bars, numbers, and centerline that is damaged due to the
patches is also included.