Ralph Wenz Field SRE Building Construction

Constructing Snow Removal Equipment Building and Upgrades

Status

Accepting Bids

Prebid Date12/7/18 1:00 pm

Bid Date1/10/19 2:00 pm

Company & Contacts

T-O Engineers

Wes Werbelow (wwerbelow@to-engineers.com)   307-587-3411

Location

Pinedale, Wyoming

The project is divided into two (2) bid schedules. Bid Schedule 1 includes constructing the Snow Removal Equipment (SRE) Building similar to how the building was constructed prior to the building burning down. Foundation and stem walls will be reused and will include timber framing, metal siding, overhead door, walk in doors, roofing, electrical, and restoring power to two hydraulic gates. Bid Schedule 2 includes upgrades to the building, including a second overhead door, insulation, heating, updated LED lighting, and a trench drain that drains to an exterior holding tank outside the building.