Download

Midway Park Phase 1A and Lions Park Tennis Court Replacement

Park Improvements and Tennis Court Replacement

Order an entire hard copy set for $65.00
This job is available for download to registered users. Log in now


Status

Bidding Closed

Prebid Date 7/5/17 3:00 pm

Bid Date 7/12/17 3:00 pm

Company & Contacts

T-O Engineers

Bruce Taylor (Jensen-Belts Associates)   208-343-7175

Location

Nampa, Idaho

Midway Park Phase 1A: Retain and Protect existing improvements, grubbing existing surface material in landscape and hauling off site, earthwork, utility extension, construction of six (6) Pickleball Courts with fencing, one (1) 28 foot by 32 foot shelter (owner provided and contractor installed), concrete pavement, asphalt pathway, aggregate base for future playground, pressure irrigation sleeves, and amended import topsoil. Owner will install pressure irrigation system and seed. Coordinate schedule with owner per the schedule listed in Instructions to Bidders.

Lions Park Tennis Court Replacement: Demolition of existing tennis court pavement and subbase to 12.5 inches below proposed grades, demolition of existing 12 foot fencing, demolition of nets with posts, construct asphalt pavement, concrete ribbon curb, ten (10) foot high chain link fencing with gates, court surface and striping, and nets with posts.