Download

Idaho Falls Regional Airport AIP 043

Pavement Maintenance/Taxiway Rehabilitation

Order an entire hard copy set for $195.00
This job is available for download to registered users. Log in now


Status

Bidding Closed

Prebid Date 3/14/17 3:00 pm

Bid Date 3/29/17 3:00 pm

Company & Contacts

T-O Engineers

Nathan Cuvala   208-323-2288

Location

Idaho Falls, Idaho

Work associated with proposed improvements is generally described as follows:

SCHEDULE A: Runway 2-20 Pavement Maintenance
SCHEDULE B: Taxiway A South Rehabilitation
SCHEDULE C: Taxiway A North and Taxiway C Rehabilitation

Runway 2-20 Pavement Maintenance consists of approximate quantities: 5,000 LF routing and sealing existing pavement cracks, 180,000 SF rubber removal, 165,000 SY asphalt surface treatment, and 300,000 SF pavement marking.

Taxiway A South Rehabilitation consists of reconstructing portions of Taxiway A and connecting Taxiway A4, and mill and overlay portions of Taxiway A. Work includes asphalt pavement removal, excavation, subbase course, base course, hot mix asphalt pavement, shouldering, topsoiling and seeding, drainage improvements, taxiway edge lights, guidance signs, pavement marking and other items. Approximate quantities include 30,000 SY of asphalt pavement removal (by rotomilling), 8,000 SY asphalt pavement rotomilling, 25,000 CY of excavation, 14,000 CY of subbase course, 5,000 CY of base course, and 18,000 tons of hot mix asphalt pavement.

Taxiway A North and Taxiway C Rehabilitation consists of reconstructing portions of Taxiway A, Taxiway A1, Taxiway A2; mill and overlay portions of Taxiway A, Taxiway C and Taxiway A4; and reconstructing connections to Taxiway A and the terminal apron. Work includes asphalt pavement removal, excavation, subbase course, base course, hot mix asphalt pavement, shouldering, topsoiling and seeding, drainage improvements, taxiway edge lights, guidance signs, pavement marking and other items. Approximate quantities include 25,000 SY of asphalt pavement removal (by rotomilling), 14,000 SY asphalt pavement rotomilling, 20,000 CY of excavation, 10,000 CY of subbase course, 4,000 CY of base course, and 16,000 tons of hot mix asphalt pavement.